- Waste Water Treatment
In June of 2010, the fourth period waste water further treatment put into production. Total investment is 0.2 billion and scale of construction is 100,000 m3/d. It introduced world advanced Fenton oxidation fluidized bed with high-grade oxidation reactor. Total COD discharge is below 60mg/L and Colorimchy is less than 20 times. Most of waste water is used for fast-grown forest, except little for recirculation, realizing water circulation utilization and achieving the target of low consumption, no pollution and no discharge.